Buyer reference
Electronic component sourcing glossary
Definitions are written for procurement, engineering, operations, repair, and data-center teams. A definition explains a term; it does not confirm a specific supplier offer or inventory position.
- Date code
- A code used to identify when or in which production period a component was manufactured. Buyers should state the acceptable age or lot requirement in the RFQ. Read related guidance →
- End of life (EOL)
- A lifecycle status indicating that a manufacturer has announced an end to some normal production or ordering activity. EOL status does not by itself prove that no remaining supply exists. Read related guidance →
- Factory lead time
- The time a manufacturer or source indicates it needs to produce or release material. It is not the same as a guaranteed delivery date. Read related guidance →
- Manufacturer part number (MPN)
- The manufacturer's complete ordering identifier for a component. Package, temperature, grade, revision, and packing suffixes can be part of the identity. Read related guidance →
- Minimum order quantity (MOQ)
- The smallest quantity a source will accept for a particular offer. MOQ can differ from the quantity required by the buyer. Read related guidance →
- Traceability
- Records that connect an offered material to its stated source, lot, date code, packaging, condition, or supporting documentation as required by the buyer. Read related guidance →
- BOM
- A bill of materials: a list of components, quantities, references, and requirements used to build or maintain a product or system. Read related guidance →
Reviewed by Enzo Parilli · Updated August 2, 2026 · Editorial policy